BILT-BLOCKS

Eastside Lumber Presents

BILT-BLOCKS

Advanced Wood Components Manufacturing

Panelized wall, floor, and roof systems for residential and commercial construction. Transforming how Kansas City builds.

500+

Controlled Pipeline

homes

$49.5M

Projected Revenue

annual

24K

Housing Unit Gap

regional

2,750

Scaled Capacity

homes/year

Est. 2021

From Lumber Yard
to Advanced Manufacturer

Eastside Lumber was acquired in 2021 to support rebuilding and housing production in under-supplied communities across Kansas City. Through operating the business, management identified a much larger market gap.

Supplying materials alone does not produce housing at the speed or scale the region requires. Bilt-Blocks expands Eastside Lumber from a traditional supplier into a manufacturer of higher-value building components — panelized wall, floor, and roof systems that dramatically accelerate construction timelines.

Certifications

MBE
WBE
DBE
Section 3
HUBZone
Opportunity Zone

Strategic Location

Kansas City, Missouri

Positioned within an Opportunity Zone near 18th & Prospect. Access to rail, fleet logistics, and bulk inventory storage in an industry-driven manufacturing community.

The Vision

A trainable system that activates local residents with minimal skillsets to become production experts — building agency while increasing capacity and generating shared prosperity.

The Platform

Advanced Manufacturing
Built to Scale

A production hub for prefabricated building components — transforming construction from a site-by-site activity to a manufacturing-based industry.

30%

Wall Systems

Systems + Install

Pre-assembled wall panels with framing, sheathing, and openings. Ready for rapid on-site installation.

15%

Floor Systems

Systems + Install

Engineered floor cassettes built to spec. Reduces on-site labor and ensures structural precision.

10%

Roof Systems

Systems + Install

Complete roof truss systems manufactured to exact specifications for seamless field assembly.

The Operating System

Housing Production OS

Not a project. Not a plant. An operating system for housing capacity at scale. Integrating capital, manufacturing, field operations, and market demand into a single repeatable system.

01

Capital

Tranche agreements + pooled closings make absorption an input, not a risk.

02

Manufacturing

Each $10M cell produces 500 homes/year, breaking even by year 2.

03

Field

Standard site kits + SLAs = predictable set and finish timelines.

04

Market

16,500 mortgage-ready buyers in KC. Pipeline secured before production.

HUBs + CELLs = Network

HUB

200K SF Master Factory

2,000 Homes/Year

+

CELL

40K SF Microfactory

500 Homes/Year

200 Cells → 100,000 Homes Annually

1M Homes in 10 Years

Revenue Model

Wall Systems + Install30%
Third-Party Builder Sales25%
Floor Systems + Install15%
Roof Systems + Install10%
Framing Material Supply10%
Additional Material10%

The Opportunity

16,500 Families.
<200 Homes/Year.

Production capacity is the bottleneck — billions in demand locked behind a construction system built for a different era.

24K

Housing Units

Regional underbuilt gap

16.5K

Families Ready

Mortgage-qualified today

$5.7B

Unbuilt Demand

$350K avg. home value

<200

Annual Output

Current core capacity

The Problem

  • New construction flatlined at 711 homes/year across KCMO
  • Fewer than 112 homes built south of the river
  • Labor shortages create persistent budget overruns
  • Projects rely on fragmented, out-of-region prefabrication
  • Traditional builders avoid urban core neighborhoods

The Bilt-Blocks Solution

  • Local manufacturing hub eliminates out-of-region dependency
  • 500 homes/year initial, scaling to 2,750 annually
  • Framing inspection readiness in two days, not weeks
  • Warehouse-ready kits stabilize costs amid tariff swings
  • Trainable system turns residents into production experts
$98,850 Revenue Per Home$30,204 Margin Per Home500 Homes Initial Capacity2,750 Homes Scaled Capacity$49.5M Initial Revenue$271.8M Scaled Revenue100 Careers Created$55K Avg Salary + Benefits
$98,850 Revenue Per Home$30,204 Margin Per Home500 Homes Initial Capacity2,750 Homes Scaled Capacity$49.5M Initial Revenue$271.8M Scaled Revenue100 Careers Created$55K Avg Salary + Benefits

What We Deliver

Production
Capabilities

Commercial

Components Production

Large-Scale Efficiency

Pre-assembled components reduce onsite labor and cut framing times by more than half.

Consistent Quality

Uniform design and code compliance streamline inspections and reduce costly rework.

Volume Discounts

Bulk material purchasing through Eastside Lumber lowers costs for developers.

Diversity Compliance

MBE/WBE/DBE/Section 3/HUBZone certified — up to 100% of diversity requirements.

Residential

Components Production

2-Day Framing

Single-family homes reach framing inspection readiness in two days, not weeks.

Affordability Impact

Faster builds and reduced labor create attainable housing for 259K cost-burdened KC families.

Warehouse-Ready Kits

Standardized designs stored and rapidly deployed. Costs stay stable even amid tariff swings.

Proven Partners

100,000+ linear feet of prefab walls and countless truss systems delivered by our partners.

Competitive Moat

Supply Chain Advantage

Prefab isn’t the innovation — owning the supply chain is. Control of materials, logistics, workforce, and compliance from day one.

01

Full Material Control

100% of framing supply secured. Price stability locked. No middlemen.

02

Storage & Logistics

Bulk inventory, fleet, loading docks, and rail-spur already operational.

03

Certified & Ready

MBE/WBE/HUBZone unlocks procurement for public and private developers.

04

Engineered for Scale

Supply, staffing, trucks, tech, and install teams integrated pre-launch.

Leadership

Right Team.
Right Time. Right Now.

100+ years combined experience. 9,000+ units completed. Global design firm. Supply chain logistics. This isn’t a startup — it’s an execution machine.

DE

Daniel Edwards

Owner, Eastside Lumber

Architectural Engineer. Scale-Built Housing. 1M Homes initiative.

SW

Summor White

CEO, Eastside Lumber

Managed $500M+ operations at Burns and McDonnell.

SM

Steve McDowell

Founding Principal & CEO, BNIM

Nationally recognized architect. 350+ awards.

GG

Greg Godbout

Owner, Soukup America

Prefab systems expert. 3-month equipment lead time.

PS

Paola Sanguinetti

Director, Design School at ASU

Robotic + prefab architecture. Former KU faculty.

KA

Kadim Alasady

Plant Manager, Bilt-Blocks

Computational designer. BIM expert for complex builds.

LL

Lynn Lang

President, 4Sight Construction

20+ year general contractor. Deep urban core experience.

CJ

Cortez Jackson

Field Manager, Bilt-Blocks

Air Force Veteran. Boeing aircraft manufacturing.

Get Started

Let’s
Rebuild.

Developer. Investor. Builder. Community partner. Whatever your role — Bilt-Blocks can accelerate your next project.

Book a Meeting

Location

Kansas City, Missouri

Opportunity Zone — 18th & Prospect Corridor